Toggle menu

Changes to bin collection days over Christmas and New Year

Your rubbish and recycling collection days may change during the festive period. Find out your bin collection day.

There will be no garden waste collections between 29 December and 9 January.

Drainage requirements

Planning and Building Control Background

There are extra drainage requirements for major projects involving either:

  • 10 or more properties
  • 1,000 square metres of non-residential floor space

We require these projects to include plans for Sustainable Urban Drainage Systems (SuDS). Effective SuDS manage surface water drainage and run-off. Your plans must show:

  • how and where you will build SuDS
  • how you will maintain SuDS

To meet drainage requirements, submit a Surface Water Drainage form with your application.

Download a Surface Water Drainage form (PDF, 622 KB)

You can find more information about drainage requirements here: