Toggle menu

Reception closed on Thursday 7 July

On Thursday 7 July our reception at Millmead House will be closed for staff training. If you need to contact us please use our online contact form. Our call centre will be operating with reduced staff. This is to ensure our phone lines are available to vulnerable residents. Normal service will resume on Friday 8 July. Thank you for your patience.

Utilities and infrastructure assessment

This is required for all projects which:

  • include 50 or more properties
  • affect more than 1,000 square metres of floor space

The assessment should include details of:

  • fowl sewage
  • connections to water, electricity and gas
  • how fibre will be supplied to the premises
  • how infrastructure will be routed through the site

Read more information in our Local Plan: Strategy and Sites 2019 (policies ID1 and D1: Place Shaping, including Policy D1 (11) (b)).