Toggle menu

Bin collections

Due to the high temperatures forecasted, our bin crews will be starting collections earlier than usual to help keep them safe in the heat. Please make sure your bins are out the night before, as collections will take place from 6.00am for the rest of the week. Thank you for helping our crews work safely during the hot weather.

Drainage requirements

Planning and Building Control Background

There are extra drainage requirements for major projects involving either:

  • 10 or more properties
  • 1,000 square metres of non-residential floor space

We require these projects to include plans for Sustainable Urban Drainage Systems (SuDS). Effective SuDS manage surface water drainage and run-off. Your plans must show:

  • how and where you will build SuDS
  • how you will maintain SuDS

To meet drainage requirements, submit a Surface Water Drainage form with your application.

Download a Surface Water Drainage form (PDF, 622 KB)

You can find more information about drainage requirements here: